Do you have a large jaquzzie tub that you don't use, and is taking up space and you have a very small shower I can take that space and turn it into a nice bigger and more comfortable shower. Or if you have a regular shower that needs to be updated,
I can help you out.
We can demo your complete old shower, and start from scratch. Once all have been demo we will inspect all studs on wall and make sure there is no water damage, if damaged we will replaced with new studs. We will do all plumbing work needed, new shower valve its always recommended to changed the old one. Installed a new drain, if converting a tub into a walking shower drain has to be moved 12"-16" away from the wall, or in some cases people request to move the drain to the center.
If needed a bigger shower and there is room to make it bigger, we can certainly work on that. Some added options on a shower are a nitch (shampoo box) a rear bench seat or corner bench, we will work with you to have any accommodation option needed. I also can transform a regular shower to a handicap shower.

Once all is set, this is the process of a regular shower
1st cover all walk way with tarps, set plastic on bathroom door to keep dust to a minimal, and cover anything that needs to be cover with plastic. demo, clean and haul away all trash
2nd do any frame work needed for shampoo box, curb, and or extend walls.
3rd installed new drain, new shower valve, and installed shower pan liner.
4th installed all ½"hardy backer were needed, then seal all seams.
5th test shower pan for any leaks
6th next float shower floor with a slope to drain
7th (optional) build a rear bench seat or corner bench seat with cinder blocks.
8th have approval from the home owner on the laying of the wall tile if any pattern or inserts on tile and grout joint size.
9th start installing tile on walls, bench and shower floor
10th grout all tile installation.
11th installed valve fixtures.

If bathroom floor needs to be tile we can installed it after shower has been done.
This is only a typical work process. On some cases process may be different.

Experience:
I have been doing tile and shower remodels for 18+ years.
I will come and talk with you and give you the best options for your project. (not a sales person)
I will come and measure and get all the details needed to give you a very accurate free estimate. Some customers will text me some basic information and pictures of what they have, then I can text them back with a ball park # on cost, if cost is with in their budget, we will set up a time and date to come and discuss their project.

Have plenty of references, pictures of my work upon request
I only do a project at a time, so once we start a project we work on it until it gets finished, and you are 100% satisfied.
I give 1 year warrantee on all labor.

Please text me if you have any tile project. or call me if i don't answer please leave your name and # and i will get back to you ASAP.
Thank You
  • do NOT contact me with unsolicited services or offers

post id: 6847659387

posted:

best of [?]